FAQs for Property Developers
Find answers to common questions about submitting your developments, uploading documents, and connecting to open eir’s fibre network. If you can’t find what you’re looking for, please contact the open eir team.
Getting Started and Registration
Developers should register their development as early as possible to allow sufficient time for design, planning, and delivery.
Site layout drawings, plot details, build schedule/programme, contact information, and utility layouts and ducting plans (where available).
Portal Access and Account Management
Users can register online, verify their email address, and complete the required validation checks to gain access to the portal.
First, attempt to reset your password. If access issues persist, contact the support team for assistance.
Design and Survey Process
Once a site is registered, the design process begins, including a desktop assessment and, where required, a site survey.
Yes. Design amendments can be requested through the portal; however, changes may impact delivery timelines.
Timescales and Delivery
Designs are typically issued within four weeks, depending on the completeness of information and site complexity.
Incomplete documentation, site readiness issues, contact difficulties, and design changes.
Developer Responsibilities
Developers are responsible for installing ducting, chambers, draw ropes, and internal pathways in accordance with Open eir specifications.
Documentation and Technical Requirements
CAD drawings, utility layouts, phasing plans, and supporting documentation.
All site drawings must be submitted in DWG format.
Phased Developments
Additional phases can be registered through the portal, although submitting the entire scheme in one application is recommended.
Site Readiness and Inspections
Confirm site readiness through the portal or contact Secto using the details provided in the portal.
Communication and Support
Developers can contact the New Developments Team by email or telephone.
Customer Activation
Once infrastructure is approved, fibre is installed, and addresses/Eircodes are activated.
Changes and Updates
Upload updated drawings through the portal and request a revised design.
Compliance and Standards
All infrastructure must comply with current Open eir technical specifications.
Materials Collection
A materials list and collection instructions are provided with the design pack.
Yes. Authorised contractors may collect materials with the required documentation.
Didn't find what you were looking for?